We carry out the complete electrical installation of grid-scale battery energy storage plants for EPC contractors, developers and utilities, from unloading the first battery container to 33 kV and EHV evacuation.

Overview

What we do

Battery storage plants bring a dense mix of equipment onto one site: battery containers, power conversion systems, inverter-duty transformers, kilometres of power and control cable, fire protection and plant controls. EHV Engineers brings one team to install all of it, working to the OEM's method statements and the EPC's schedule.

Our reference is the 57.5 MW / 115 MWh Kalasar BESS in Rajasthan, live since the end of September 2026, where we installed 56 PCS units, 28 battery containers and seven inverter-duty transformers, with about 51 km of cable.

Because we also build and maintain EHV substations, we handle the grid side as well: 33 kV switchgear, power transformers and 220 kV bay integration. After commissioning, we can take the plant into a maintenance contract.

Battery & PCS

  • Unloading and placement of battery containers
  • PCS units and LT ACDB
  • Pre-commissioning checks with OEM teams

Transformers

  • Inverter-duty and auxiliary transformers
  • Oil filtration with our own plant
  • Testing and energisation support

Cabling & civil

  • 33 kV, LV, control and fibre cabling
  • Terminations, joints and glands
  • Trenching, cable tiles and tray supports

Auxiliaries & grid

  • EMS/SCADA panels and UPS
  • NIFPS fire protection
  • SVGs and harmonic filters
  • 33 kV and 220 kV bay integration

Experience

Related projects

  • BESS · 57.5 MW / 115 MWh

    Kalasar BESS, Rajasthan

    Client
    Leading Indian power utility
    Scope
    Complete electrical installation, cabling and civil; testing and commissioning support
  • Power quality

    SVG and harmonic filter installation

    Client
    Continuum Green Energy, Tata Power, ACME Solar
    Scope
    Installation

Questions

BESS Installation FAQ

Have you completed a grid-scale BESS project?

Yes. We carried out the electrical installation for the 57.5 MW / 115 MWh Kalasar BESS in Rajasthan for a leading Indian power utility. It has been live since the end of September 2026.

Do you work alongside the battery and PCS OEM?

Yes. Installation and pre-commissioning are done with the OEM's teams and to their method statements, so warranty requirements are met.

Can you also install SVGs and harmonic filters?

Yes. We install static var generators and harmonic filters, and have done so for Continuum, Tata Power and ACME Solar.

Have a BOQ or a site to maintain?

Send it over and we will reply with an execution plan and quotation.