EHV EngineersBikaner · Since 2011 Get a quote
  1. Home
  2. Services
  3. EHV Substation Works

Service · Substations

EHV substation works up to 400 kV

Erection of switchyard and control-room equipment for EHV and HV substations, including power transformer installation and replacement up to 125 MVA, for utilities, transmission companies and renewable developers.

Overview

What we do

We have erected and commissioned 400 kV and 220 kV grid substations for RVPNL and for Adani, and replaced power transformers of 100 and 125 MVA at renewable pooling substations.

Our crews, supervisors and tools are our own, including an oil filtration and vacuum plant for transformer work, so mobilisation does not depend on sub-contractors. As a Class-A electrical contractor certified to ISO 9001, 14001 and 45001 for substations up to 400 kV, we work to utility and owner's-engineer standards.

Every installation is followed by testing and commissioning by the same team, and many clients keep us on for maintenance.

Switchyard

  • Structures, gantries and busbar
  • Breakers, isolators, CTs and PTs
  • Lightning arresters and wave traps

Power transformers

  • Erection, assembly and oil filling
  • Replacement of transformers up to 125 MVA
  • Oil filtration and vacuum drying with our own plant

Control room

  • Control, relay and protection panels
  • Battery banks and ACDB/DCDB
  • Control cabling and terminations

Earthing & cabling

  • Earth mat and equipment earthing
  • Lightning protection
  • Power and control cable laying

Experience

Related projects

  • Substation · 400 kV

    400 kV GSS Ajmer, Babai, CPSU 1 and 2

    Client
    RVPNL and others
    Scope
    Erection and commissioning
  • Substation · 220 kV

    220 kV GSS: Adani North and South Block, Ravra, Nokhra

    Client
    Adani
    Scope
    Erection and commissioning
  • Transformers · up to 125 MVA

    Power transformer replacements: 125 MVA, 100 MVA and 3 × 125 MVA

    Client
    Hero Future Energies, Adani Green, Saurya Urja
    Scope
    Replacement and commissioning

Questions

EHV Substation Works FAQ

What voltage levels do you work on?

We work on substations up to 400 kV, and our ISO certificates cover supply, erection, repair, testing and commissioning of transmission lines and AIS substations up to 400 kV.

Do you replace power transformers?

Yes. We have replaced power transformers of 100 MVA and 125 MVA, including three 125 MVA units, for Hero Future Energies, Adani Green and Saurya Urja.

Do you work for EPC contractors?

Yes. We regularly work as the erection and commissioning partner for EPC contractors, either on item-rate BOQ or on a defined scope.

Have a BOQ or a site to maintain?

Send it over and we will reply with an execution plan and quotation.